Our Projects

SEED Engineers have completed a wide range of building projects for various sectors. Please browse through our portfolio to see the work we did, the challenges we faced, and the solutions we provided to meet our client’s requirements.

If you are looking for sustainable and eco-friendly design solutions for your next project, give us a call and one of our team members would be happy to discuss your needs.

Auburn Ambulance Station Fitout

The heritage building of the Auburn Ambulance Station is being trasnformed into a state of the art pub and restaurant. The work for the fitout involved designing energy-efficient and cost-effective mechanical services including VRF air conditioning system, energy-recovery air conditioning system, and kitchen ventilation system. This involved CFD odour modelling to ensure that occupants of adjacent apartment building would experience no odour nuisance outside their balconies. Veritech grease filters and COANDA hoods were used to ensure that no grease or odour (below compliance) is exhausted into the local atmosphere.
READ MORE

Grafton Base Hospital – Ambulatory Care Unit

The project encompasses the construction of a new three storey building comprising of two levels of patient care, an undercroft area and a plant room. Healthcare facilities, by their nature, are complex, with a wide range of functional and services requirements that place a high demand on energy, water and materials.
READ MORE

Mater – Steam and Heating Feasibility Study

The Steam and Heating Feasibility Study’s Project Mission is to investigate and determine the most suitable transition plan to replace steam and heat generation at Mater’s South Brisbane campus towards less emissions-intensive, more socially and environmentally acceptable technologies, in line with the Mater Sustainability Program.
READ MORE

King’s Co-op

We provided mechanical design and kitchen ventilation for a single level bar and restaurant. This project consisted of a kitchen, 2 bar areas, and amenities.
READ MORE