Nando’s Festival Towers
SEED was engaged to provide advice about a smoke problem involved with the kitchen exhaust system.
Client: | MTB Projects |
Work Type: | Refurbishment Design, Verification Services, Assessment of Built Works |
Sector: | Retail |
Size: | $20,000.00 |
Disciplines Engaged: | Mechanical |
The Challenges Faced
There were issues with the coordination of base building infastructure and grease build up.
The Solution Provided
We were able to provide advice on the flow rates required and on fan sizing for a like-for-like kitchen exhaust replacement. To prevent the grease building up within the duct reoccurring we changed the filtration type so that the grease could be collected locally and can be easily maintained.